TR3SPASS FORUMS
« San Jose ake Cunningham Early Design »

Welcome Guest. Please Login or Register.
Nov 22nd, 2009, 01:52am




Pages: 1  Notify Send Topic Print
 thread  Author  Topic: San Jose ake Cunningham Early Design  (Read 411 times)
Crooked Cop
Administrator
ImageImageImageImageImage

member is offline

Avatar




Homepage PM

Gender: Male
Posts: 1078
xx San Jose ake Cunningham Early Design
« Thread started on: Apr 1st, 2006, 6:09pm »

User Image

Bowl area features:

Skull Bowl.
A 36' diameter circular bowl with 10' transitions with 2' of vert. The shallow end is 6’ deep with three 60-degree corners. Pool Coping.

Thumb Bowl:
5’ deep mini ramp bowl with a 135-degree hip and corner going into a 7’ deep circular bowl. Steel Coping.

Kidney Bowl:
5’ deep shallow end to 9’deep end LH Kidney. Pool Coping.

Flow Bowl:
6’ deep flow bowl with:
Super Vert Wall. 9.5’ transition, 10’ of vert, 11’ Extended Vert.
Ladle. 6’ transition, 30-degrees over vert. Pool Coping.
Cradle. 19’ diameter.
Thimble. 15’ diameter to 10’ diameter.
Super Bank Hip. 49-degrees steep, 9.5’ high, 135-degree hip.
Shallow Pocket. 4’ deep. Pool Coping.

Signature Feature:
Full-Pipe, Halfpipe Bowl:
22’ diameter full pipe with 36’ long straight section, spillway entry and “breaking wave”.
Halfpipe with 11’ transitions and 1.5’ of vert. Pool Coping.
Rectangular bowl, 8’deep with 8’ transitions, 5’ deep Pocket with 7’ transitions. Pool Coping.

Halfpipe Bowl:
16' wide, 6' deep, 8’ transition mini ramp shallow end connected to 16’ wide, 10’ deep, 9’ transition vert ramp deep end. 30-degree steep waterfall and four 90-degree bowl corners. Steel coping. The purpose is to learn tricks on the mini ramp and then take it to the vert. This is the design that I made and gave to Zach. I’m thankful to him for including it in the overall design.

Ledge Pathway:
A long pathway of various ledges and a flat rail.

User Image

Street Course and Baby Bowl area includes:
Dip Gap: 3’ deep, 18’ radius, 8’ wide dip.
6-Stairs, Banks, Ledges and Rail.
Pyramid with ledge, step up gaps and curved rail.
High Bank
10 Stairs with step up gap, ledges and banks.
Double set bank with steep side bank and side ledge.
Steep bank wall next to the pyramid.
2’ deep noping bowl. Noping.
4’ deep spine bowl. Steel Coping.
4.5’, 3’, 3.75’ deep Baby Amoeba. Steel Coping.
Three 1’ deep baby dips.
« Last Edit: Mar 22nd, 2009, 08:00am by Crooked Cop » User IP Logged

Stand firm or feed worm.
Crooked Cop
Administrator
ImageImageImageImageImage

member is offline

Avatar




Homepage PM

Gender: Male
Posts: 1078
xx Re: San Jose ake Cunningham Early Design
« Reply #1 on: Mar 22nd, 2009, 07:57am »

Some rookie broke his wrist in half in the pipe yesterday. Super knar. Paramedics, stretchers.
User IP Logged

Stand firm or feed worm.
Dan
Christ Air
ImageImageImageImageImage

member is offline

Avatar




PM

Gender: Male
Posts: 649
xx Re: San Jose ake Cunningham Early Design
« Reply #2 on: Mar 24th, 2009, 9:42pm »

Thats f**ked, its isn't hard to get broken off in that thing though.

Hope they get better, broke in half? damn...
« Last Edit: Jun 16th, 2009, 12:14am by Dan » User IP Logged

Arnold Layne
New Member
Image

member is offline

Avatar




PM


Posts: 3
xx Re: San Jose ake Cunningham Early Design
« Reply #3 on: May 19th, 2009, 9:08pm »

little late on this one, but, paramedics, strechers?
« Last Edit: May 19th, 2009, 9:29pm by Arnold Layne » User IP Logged

Crooked Cop
Administrator
ImageImageImageImageImage

member is offline

Avatar




Homepage PM

Gender: Male
Posts: 1078
xx Re: San Jose ake Cunningham Early Design
« Reply #4 on: Nov 9th, 2009, 4:22pm »

Lights coming in January.

https://cpms.sanjoseca.gov/pub/PrjDetail.cfm?prj_id=5944&count=51
User IP Logged

Stand firm or feed worm.
Pages: 1  Notify Send Topic Print
« Previous Topic | Next Topic »


New Monthly Ad-Free Plan!

$6.99 Gets 50,000 Ad-Free Pageviews!
| Free Shoutboxes | Hookah |

This Board Hosted For FREE By Conforums ©
Get Your Own Free Message Board!